Flood Fence
VJ Engineering is the Authorized Agent of DARCY SPillcare – UK for the country of Malaysia, Singapore & Brunei.
FloodFence™ is a lightweight and quick to deploy water diversionary system. The system can be connected and deployed rapidly by one person. It doesn’t require any ballast to be pre-applied.
The system is self-balancing. The moving water flow applies a strong downward pressure onto the FloodFence units. This keeps them fixed in place, as well as applying pressure to the sealing gaskets.
Product Information:
- Quick and easy to deploy – just connect up the units
- Minimal Storage. Units stack neatly, you can fit many to a single pallet.
- System uses the force of the flowing water to remain in place
- Durable – manufactured from ABS plastic
- Easy to connect up the FloodFence™ units to each other
- Each unit incorporates hard wearing gaskets for sealing
- Rapid water flow diversion for businesses and households
- Partially block off a weir crest for works
- Water diversion & deflection for drainage and burst water pipes
- Chemical spill diversion